• <tr id='QAz62n'><strong id='QAz62n'></strong><small id='QAz62n'></small><button id='QAz62n'></button><li id='QAz62n'><noscript id='QAz62n'><big id='QAz62n'></big><dt id='QAz62n'></dt></noscript></li></tr><ol id='QAz62n'><option id='QAz62n'><table id='QAz62n'><blockquote id='QAz62n'><tbody id='QAz62n'></tbody></blockquote></table></option></ol><u id='QAz62n'></u><kbd id='QAz62n'><kbd id='QAz62n'></kbd></kbd>

    <code id='QAz62n'><strong id='QAz62n'></strong></code>

    <fieldset id='QAz62n'></fieldset>
          <span id='QAz62n'></span>

              <ins id='QAz62n'></ins>
              <acronym id='QAz62n'><em id='QAz62n'></em><td id='QAz62n'><div id='QAz62n'></div></td></acronym><address id='QAz62n'><big id='QAz62n'><big id='QAz62n'></big><legend id='QAz62n'></legend></big></address>

              <i id='QAz62n'><div id='QAz62n'><ins id='QAz62n'></ins></div></i>
              <i id='QAz62n'></i>
            1. <dl id='QAz62n'></dl>
              1. <blockquote id='QAz62n'><q id='QAz62n'><noscript id='QAz62n'></noscript><dt id='QAz62n'></dt></q></blockquote><noframes id='QAz62n'><i id='QAz62n'></i>
                HOME

                24小时服务热线:15189488488 0516-85159111 0516-83181858

                关于我们 /ABOUT US

                营销网络/NETWORK

                首页 >> 工程案例 >> 网架安装顺序及安装方法

                工程案例

                网架安装顺序及安装方法

                DATE:2012/12/7  FROM:江苏常源钢结构有限公司

                  网架的安装,采取的都是散装法。其操作流程为:放线、验线 安装下弦平面网ζ格 安装上弦倒三角网ω 格 安装下弦正三角网◎格 调整、紧固 支座焊接与验收;检查柱顶混凝土强度。检查试件报告,合格后方能在高空柱顶放线、验收。由总包提供柱顶轴线位移情况,网架安装单位对提供的网架支承点位置、尺寸进◆行复验。在¤脚手架上,用全站仪定出各支座支承面中心点,然后校对各轴线◥位置后,才能进行网架的安装。临时支点的位置、数量、支点高度应统一安排】,支点下部应适当加固,防止网架支点局部受力过⊙大,架子下沉。对于地面上散装要保证支点下基础强度可靠,保证不下沉。
                  网架◣安装方法:网架≡组装单元节点前,必须对零部件反复进行〇检查,按顺序对号入▂座。组装完每个@单元节点后,用加ξ 力板手检查螺栓的拧紧度。网架安装一定面积后,下弦用临时支撑∮支承住,以校正其下弦标高。整个网架安》装后,重新检查紧固螺栓一遍,调整好后卸下临时支撑╱。边安装边用经的位置误』差。